Quality, the key to sustainable development

Quality, the key to sustainable development

It was done with the role of Kermanshah Province Soil Mechanics and Technical Laboratory/ more than 10 thousand test cases were registered in the Kermanshah-Miandoab highway project.

2022-12-22 12:35:46 | News | ID : 3122 | Visit : 304

It was done with the role of Kermanshah Province Soil Mechanics and Technical Laboratory/ more than 10 thousand test cases were registered in the Kermanshah-Miandoab highway project.
It was done with the role of Kermanshah Province Soil Mechanics and Technical Laboratory/ more than 10 thousand test cases were registered in the Kermanshah-Miandoab highway project.

آزمایشگاه فنی و مکانیک خاک استان کرمانشاه موفق شد با انجام بیش از 10 هزار و 883 مورد آزمایش در پروژه بزرگراه کرمانشاه- میاندوآب ( قطعه 10 الف) نقش آفرینی ویژه‌ای در ارتقاء کیفیت، افزایش طول عمر مفید و کاهش هزینه های این پروژه عمرانی داشته است.

 

alireza cheraghi modir azmayeshgahe kermanshah


 

به گزارش روابط عمومی شرکت آزمایشگاه فنی و مکانیک خاک، علیرضا چراغی مدیرکل آزمایشگاه فنی و مکانیک خاک استان کرمانشاه با اشاره به مشخصات این پروژه گفت: در این قطعه از بزرگراه به طول 24 کیلومتر ، 5 دستگاه پل، تعداد 138 مسیر آب، بیش از 250 هزار تن آسفالت و بیش از 36 هزار متر مکعب بتن ریزی انجام و اجرا شده است.

 

چراغی افزود: در همین راستا آزمایشگاه فنی و مکانیک خاک استان کرمانشاه به عنوان بازوی توانمند و امین وزارت راه و شهرسازی در ارائه خدمات خاص و منحصربفرد ، انجام بیش از 3 هزار و 200 مورد آزمایشات کنترل بتن، 4 هزار و 583 مورد آزمایش کنترل عملیات خاکی و 3 هزار و 24 مورد آزمایش کنترل عملیات آسفالتی را در راستای اهداف دولت سیزدهم و وزارت راه و شهرسازی در راستای ارتقاء کیفی پروژه به ثبت رسانده است.

 

  • لینک کوتاه
Comments
    There are no results!

You can also comment your opinion about this content: