| # | Service | Quantity |
|---|---|---|
| 1 | Standard Guide for Magnetic Particle Testing | 1 |
| 2 | Supply of consumption primary materials (PT) | 1 |
| 3 | كارشناس به منظور تشخيص و اعلام نظر و يا نظارت برعمليات اجرايي. | 1 |
| 4 | Equipping the workshop to control the quality of welding and metal connections. | 1 |